HAYDEN, Idaho: Hayden’s snowplows work from the busiest roads toward neighborhood streets, with crews typically clearing the city’s approximately 180 lane miles within 24 to 48 hours. But the timing varies with each storm, Deputy Public Works Director Ty Kovatch told the City Council on Nov. 10.

Presenting the city’s 2026–27 winter response plan, Kovatch outlined how crews prioritize routes, what can slow their work and what residents can do to help. Council members also raised a familiar concern: the snow berms plows leave across driveways.

Watch the presentation: Hayden Reporter’s approximately 17-minute excerpt includes Kovatch’s winter response presentation and the council’s questions.

Which roads get cleared first?

The city generally activates its plowing routes when snow reaches about 3 inches, Kovatch said.

Crews first clear arterial and collector roads, the major routes that carry traffic through the city and connect neighborhoods, before moving to residential streets. Routes are organized into areas typically assigned to two-person crews.

“We prioritize the roads that have the highest demand,” Kovatch said, explaining that problems on those roads carry the greatest safety consequences.

That approach can frustrate residents waiting to get out of their neighborhoods. Kovatch said the city receives calls from people who would prefer crews begin near their driveways and work toward the major roads.

The city’s approach follows the opposite order.

Why response times vary

Twelve employees, six from parks and six from streets, handle winter response, which becomes a round-the-clock operation during snow events.

The typical 24- to 48-hour clearing window is not a guarantee for every storm. Prolonged snowfall, freezing and thawing, equipment breakdowns and the timing of a storm can change how quickly crews reach individual streets.

A storm arriving during the regular workday allows staff to begin promptly, Kovatch said. Overnight storms require a different response, although lighter traffic makes nighttime plowing easier. Daytime traffic can slow the equipment.

Repeated storms also require attention to employee fatigue.

With a small crew operating heavy equipment throughout the city, Kovatch said staff must monitor working hours and make sure operators can continue safely.

What about berms across driveways?

Council discussion turned to the heavy ridges of snow and ice left across driveway entrances, including the difficulty of removing them after they freeze.

Council President Ed DePriest asked how the city determines when to use snow gates, Kovatch said their use depends largely on the equipment. He said berms will still occur to varying degrees.

Kovatch acknowledged the frustration and difficulty they create. He said addressing berms at thousands of driveways would require resources beyond what the city’s small staff can reasonably provide while keeping roads passable.

The discussion did not establish a specific operating rule for snow-gate use or promise berm-free driveways.

How residents can prepare

Kovatch encouraged residents to make arrangements before snow arrives, particularly for household members or neighbors who may need help shoveling.

His recommendations included:

  • Keep parked vehicles, garbage cans and other obstacles out of plowing routes.

  • Avoid pushing or shoveling snow into the roadway.

  • Have shovels ready or arrange for someone to help clear walkways and driveways.

Kovatch said property owners are responsible for clearing their sidewalks and driveways, and that city crews do not have the staffing capacity to handle those requests.

He also noted that road-maintenance responsibility varies by jurisdiction. Some nearby areas fall outside the city’s responsibility, which can create confusion when residents call about plowing.

Equipment and deicer preparations

Kovatch reported that the city’s equipment was in good condition and its deicer storage tanks were full as of the meeting.

The new Public Works facility allows crews to store deicer and refill trucks on-site, reducing trips that previously were necessary to obtain material.

The city has its own mechanic for preventive maintenance and repairs, along with a contract mechanic available to supplement that work during winter.

Crews also enter this season with more experience. Several employees were new to the work last winter, Kovatch said, and now have a season of familiarity with routes, cul-de-sacs, snow-storage easements and obstacles.

Support Local Journalism

Hayden Reporter is locally operated and reader supported. If you find this reporting useful, you can support our work here:

Reply

Avatar

or to participate